Thursday, December 10, 2009


Note: chipping and cleaning works on blocked/clogged pvc pipe sleeves are being done by MEGAPIPE BUILDERS INC.(M.B.I.) personnel while precast walls are still not installed as per instruction of Engr. Ruel Pabon(VP OPERATIONS AND TECHNICAL)

1 comment:

  1. Ton,

    Pls inform Roland and Livan (precast engr) to remove the concrete spillover on the pipe sleeve openings. This should be the job of the Senen, our precast fabricating contractor.

    Ed