Thursday, December 10, 2009



Attention Ed:
pls note approved exhaust duct louver..
suggestions:
-as per discussions between D.C.I. and M.B.I.'s Engineer Ruel Pabon and Engineer Robert Lastrella(HVAC consultant), suggestions to increase the diameter of the outer plate cover and to reduce diameter of socket going into pipe sleeve were raised to give way for proper alignment of exhaust duct louvers..

Henry Sy jr. together with Engr. Mike and Ed, taken during walk thru at sea residences (12/9/09)

Note: chipping and cleaning works on blocked/clogged pvc pipe sleeves are being done by MEGAPIPE BUILDERS INC.(M.B.I.) personnel while precast walls are still not installed as per instruction of Engr. Ruel Pabon(VP OPERATIONS AND TECHNICAL)







Attention Ed:


-pls take note of partial blockage of pvc pipe sleeve in precast walls (bottom pic)
-full blockage of pvc pipe sleeve in precast walls(top pic)

Attention Rexel(HILTI):

-pls advise on the best suited chipping tool for this application.. thx..











missing pipe sleeves on the upper floor
missing pipe sleeves on the upper floor